CHF555'000
Route de la Cierne 180, 1619 Les Paccots
Standard-rate range. Exemptions and reduced rates are not included. FTA rules 2022-11
The official tax value is assessed separately and is not the asking price.
Additional notary or land-register costs may apply. Excludes mortgage, maintenance and personal income or wealth tax. Confirm the binding amount before buying.
As of 07 Sept 2026
The asking price is close to the median of .
This listingCHF 555'000
CHF 545'000
Median
Is there room to negotiate?
A typical listing stays on the market for about 27 days — this one has been up for 1 day. 0% of active listings have cut their asking price in the last 90 days. Asking prices per m² are about 0.6% higher than a month ago.
Market history
ARE transit class D — a car is needed for most trips.
72% green and natural space within 500 m.
Mostly singles and single parents · around 40 people in the neighbourhood.
84 %
Lower than 43% of municipalities in the canton
ESTV · 2026
Times refer to the route on foot.
noise level by day
Elevated noise levels
More exposed to traffic noise than typical residential spots.
Night
47 dB
Loudest source
Road
Louder than 91% in the canton
Measured noise level, placed on a scale of everyday sounds.
Pollutant levels are below the WHO guideline.
Hardly any elevated radon levels in the area.
Some buildings
Available from 2 networks.
Marine Vinez
Châtel-Saint-Denis und Les Paccots vereinen das Beste aus zwei Welten: die Annehmlichkeiten des Hauptorts der Veveyse und eine alpine Umgebung auf über 1.000 Metern, mit Wanderungen, Langlauf und sauberer Luft das ganze Jahr über.
Die Wohnanlage Chalet 1909 bietet im 1. Stock zwei 3,5-Zimmer-Wohnungen in PPE.
Das Objekt B bietet 62,5 m² Wohnfläche, eine Terrasse von 31,8 m² und einen großen, privaten Garten
Das Objekt C bietet 62,3 m² und einen Balkon von 4,8 m².
Diese 3,5-Zimmer-Wohnungen umfassen:
Das Gebäude bietet allen modernen Komfort; Heizung durch Luft/Wasser-Wärmepumpe, Photovoltaikpanele, Dreifachverglasung.
Die Bauarbeiten haben begonnen, die Fertigstellung ist für Dezember 2027 geplant.
Wir stehen Ihnen für eine umfassende Projektpräsentation zur Verfügung.