CHF26'500/Month
Weyermattstrasse 12, 2560 Nidau
Homematch estimate
As of 07 Sept 2026
How fast do rentals move here?
A typical listing stays online for about 24 days — this one has been up for 148 days.
Observed asking prices – not signed leases or a valuation.
Market history
ARE transit class B — regular service within a short walk.
81% built-up area within 500 m.
Mostly singles and couples · around 116 people in the neighbourhood.
170 %
Lower than 59% of municipalities in the canton
ESTV · 2026
Times refer to the route on foot.
noise level by day
Average noise levels
Typical levels for residential areas.
Night
37 dB
Loudest source
Road
Quieter than 52% in the canton
Measured noise level, placed on a scale of everyday sounds.
Typical values for this region.
Hardly any elevated radon levels in the area.
Nearly all buildings
Available from 3 networks.
Villa Collective Nidau | BE
The Villa Collective Nidau is a high-quality and established healthcare and care property in a preferred, central location in Nidau. The architecturally convincing ensemble consists of a listed villa from 1896, a pavilion-like intermediate building (2008), and a wheelchair-accessible new building with living studios (1990), which are functionally and structurally connected to each other.
The complex is complemented by a historic garden house with a hipped roof and an aviary (built in 1928) as well as a well-maintained outdoor area with green spaces, a bicycle shed, and outbuildings. The villa and the garden house are listed in the cantonal inventory of historic buildings and underline the representative character of the property.
The entire complex has been successfully operated as a retirement and care home since 2012 and is currently rented to Tertianum. The existing lease agreement expires in September 2027.
Thanks to the fully available care infrastructure, the generous and flexible room structure, and the zoning WG3 (residential / commercial / office), the Villa Collective is suitable for both a seamless continuation in the care or healthcare sector and for alternative, approved uses in the service, education, or administration environment.
Building layout & structural structure
Old building - Villa (built in 1896)
The listed villa with a hipped roof and dormer windows extends over two full floors, a partially built-out attic, and a basement. The vertical access is via a two-flight winding staircase with a half-landing; a lift is not available in the old building.
The facade is made of exposed brick with ornamental stone alternation and careful sandstone articulation. Partially, double-glazed wooden windows are available. Rafflamellen shutters serve as sun protection. The rooms are equipped with historic radiators with Danfoss regulation.
The main entrance is via a staircase or ramp on the west side into the intermediate building.
On the ground floor, there are community and dining rooms.
In the basement, there are the central laundry room, the heating room (Gastherme Elco, 2011, boiler 400 l), a food storage room, and a cold room with two cooling cells (2013).
The 1st floor houses office spaces.
In the attic, there is an externally rented 3.5-room apartment.
The floor coverings on the ground floor consist mainly of parquet, supplemented by antique plate coverings in corridors and staircases as well as plate coverings in wet cells and kitchens.
Intermediate building / Pavilion (built in 2008)
Between the villa and the new building lies a single-story pavilion, which is used as a lounge and dining hall. It includes a buffet and part of the kitchen, which is functionally connected to the main kitchen in the old building.
The intermediate building is accessible both via the western main entrance and via an additional wheelchair-accessible entrance on the east side. The building is not basements and is finished with a flat roof.
New building (built in 1990)
The new building with a gabled roof and dormer windows has three full floors, a partially built-out attic, and a basement. A centrally located spiral staircase on the north side and a Schindler lift (1988, control renewed in 2021) connect all floors and ensure fully wheelchair-accessible access.
Access is via the intermediate building.
On the ground floor, there is a foyer with a chimney and a lounge area as well as six studios with bathrooms and balconies.
On the 1st floor, there are additional studios and a central area with an office, kitchenette, toilet, and hygiene room for station or night watch.
On the 2nd floor and in the attic, there are additional studios. All units have a balcony, bathroom, barrier-free design, and a patient call system.
In the basement, there are a lounge, therapy and storage rooms, and the house and lift technology; this area is also directly accessible via a western outdoor staircase.
Technical & Infrastructure
Construction method and technology
Domestic technology
Gastronomy & Secondary infrastructure
Parking & Secondary rooms
Maintenance & Renovations
The entire complex has been well maintained.
In 2023, the flat roof of the pavilion was renovated.